Test overview¶
The specification splits the verification into two groups (§9). They use different samples and are run in different ways.
Group 1 – QD Property Tests (9.1)¶
Each test uses its own set of samples and the tests can run at the same time.
flowchart LR
S([New samples<br/>5 per test]) --> B[9.1.1<br/>Burst]
S --> F[9.1.2<br/>Fluid loss]
S --> C[9.1.3<br/>Force to connect]
S --> P[9.1.4<br/>Pressure drop]
S --> W[9.1.5<br/>Seal washout]
classDef cross fill:#ffe0b2,stroke:#d84315,stroke-width:2px;
class F,C,P,W cross;
The orange tests are also the cross-verification tests (§10): they are repeated with at least three other suppliers' parts, our plug with their socket and their plug with our socket, n = 3.
Group 2 – Thermal / Mechanical Cycling (9.2)¶
One set of samples goes through all steps, in this order. Do not swap the order and do not replace samples along the way.
flowchart LR
H1[Helium leak<br/><i>optional</i>] --> N[9.2.1<br/>Non-op temp<br/>−40 / +70 °C]
N --> H2[Helium leak<br/><i>optional</i>]
H2 --> O[9.2.2<br/>Op temp<br/>+5 / +65 °C]
O --> Y1[9.2.4<br/>Hydrostatic]
Y1 --> M[9.2.3<br/>5000 cycles]
M --> Y2[9.2.4<br/>Hydrostatic]
classDef hydro fill:#b2dfdb,stroke:#00695c,stroke-width:2px;
class Y1,Y2 hydro;
Beginner guides¶
| Test | Guide | Detailed instruction |
|---|---|---|
| 9.1.1 Burst | – | 02 Parameters §9.1.1 |
| 9.1.2 Fluid loss | – | 02 Parameters §9.1.2 |
| 9.1.3 Force to connect | – | 02 Parameters §9.1.3 |
| 9.1.4 Pressure drop | – | 05 Pressure Drop |
| 9.1.5 Seal washout | Open guide | 06 Seal Washout |
| 9.2.x Cycling sequence | – | 03 Test plan |