03 – Test Plan and Sample Matrix per OCP UQD Specification v2.0.0

Source: OCP Design Specification Universal Quick Disconnect (UQD) v2.0.0, §9–§10 and §15.3. Parameters: see 02-Parameters.md. Products: UQD02, UQD04, UQD06, UQD08 (handmate) · UQDB02, UQDB04, UQDB06, UQDB08 (blindmate)


1. Basic rules

Rule Requirement Ref
Samples per test and configuration n = 5 (minimum) §9, ISO 18869
Samples per test in cross-verification n = 3 (minimum) §10
QD Property Tests (9.1.x) May run in parallel; separate samples per test §9
Thermal/Mechanical Tests (9.2.x) Run in sequence on the same samples §9
Instruments Accuracy per ISO 18869:2017 §6.3 §9
Helium leak test ASTM E493 §9
Report Supplier Verification Report (§15.3.1) + test templates (§15.3.3) §9, §15.3

Terms - Plug = male half, Socket = female half, Pair = plug + socket of the same size and type. - Mated = fully coupled pair. Unmated = individual plug or socket, with closed valve. - Hybrid = UQD plug coupled to a UQDB socket (blindmate). See section 6.


2. Test overview

# Test Group Configurations n Destructive
9.1.1 Burst Pressure Property UQD: plug, socket, mated · UQDB: plug, socket 5 per config. Yes
9.1.2 Fluid Loss Property Pair 5 No
9.1.3 Force to Connect Property Pair (UQDB with SA offset) 5 No
9.1.4 Pressure Drop Property Pair, both flow directions 5 No
9.1.5 Seal Washout Property Pair, both flow directions 5 Possibly
9.2.1 Non-Op temperature cycling Sequence Mated + unmated plug/socket 5 per config. No
9.2.2 Op temperature cycling Sequence Mated + unmated plug/socket 5 per config. No
9.2.4 Hydrostatic test (after 9.2.2) Sequence Same as 9.2.2 5 per config. No
9.2.3 Mechanical cycling (5000 cycles) Sequence Pair 5 No
9.2.4 Hydrostatic test (after 9.2.3) Sequence Plug, socket (unmated) and pair 5 per config. No
10 Cross-verification Separate Against ≥ 3 other suppliers 3 per test –

3. Pre-check of all samples (before test)

Recommended for every sample before it is assigned to a test:

Check Criterion Ref
Identity/marking UQDxx v2 / UQDBxx v2 visible when unmated; red/blue colour marking on handmate §11
Critical dimensions Sealing surfaces B/H, C, L, latch geometry (UQD), SA (UQDB) per 02-Parameters §5 §7
Surface finish of sealing surface ≤ 32 Ra §7
Visual inspection Per Table 10 (zones 1–7) §15.2
Threads Thread gauge per Table 5 §15.2
Termination assembly Torque per Table 5 §7.5

Each sample gets a unique ID, for example UQD04-P-07 (P = plug, S = socket) and pair UQD04-PR-03.


4. Tests per product

The same test matrix applies to all four sizes within each type. Size-dependent values (flows, forces, acceptance limits) are in 02-Parameters.

4.1 UQD02 · UQD04 · UQD06 · UQD08 (handmate)

A. QD Property Tests (separate samples per test)

Test ID Test Configuration Samples Measurements / runs
A1 9.1.1 Burst Plug, unmated 5 plugs 5 burst pressures
A2 9.1.1 Burst Socket, unmated 5 sockets 5 burst pressures
A3 9.1.1 Burst Mated 5 pairs 5 burst pressures
A4 9.1.2 Fluid Loss Pair, water 5 pairs Fluid loss per cycle per pair
A5 9.1.3 Force to Connect Pair, aligned, 0 / 2.76 / 6.89 bar(g) 5 pairs 3 pressures × 5 rep. × 5 pairs = 75
A6 9.1.4 Pressure Drop Pair, S→P and P→S, ≥ 6 flows 5 pairs 6 × 2 × 5 = 60 points + tare
A7 9.1.5 Seal Washout Pair, 2 × rated flow, 60 °C, 6.9 bar(g) 5 pairs 20 cycles × 2 directions × 5 pairs = 200

B. Thermal / Mechanical sequence (same samples all the way)

Population: 5 pairs (tested mated) + 5 plugs and 5 sockets (tested unmated).

Step Test Mated (5 pairs) Unmated (5 plugs + 5 sockets)
B1 Helium leak test (optional) ✓ ✓
B2 9.2.1 Non-Op temp. cycling, air 28–30 psi(g), −40/+70 °C ✓ ✓
B3 Helium leak test (optional) ✓ ✓
B4 9.2.2 Op temp. cycling, 6.9 bar(g), +5/+65 °C, nominal engagement ✓ ✓
B5 9.2.4 Hydrostatic test, 6.9 bar(g), ≥ 3 min ✓ ✓
B6 9.2.3 Mechanical cycling, 5000 cycles, 2.75 bar(g), latch engaged every cycle ✓ (pairs) –
B7 9.2.4 Hydrostatic test: unmated plug + socket and mated ✓ –

4.2 UQDB02 · UQDB04 · UQDB06 · UQDB08 (blindmate)

Differences from UQD: burst is not tested mated; force and cycling tests are run with radial offset SA; couplings are tested at hard-stop.

A. QD Property Tests

Test ID Test Configuration Samples Measurements / runs
A1 9.1.1 Burst Plug, unmated 5 plugs 5 burst pressures
A2 9.1.1 Burst Socket, unmated 5 sockets 5 burst pressures
A4 9.1.2 Fluid Loss Pair, water 5 pairs Fluid loss per cycle per pair
A5 9.1.3 Force to Connect Pair, max SA offset (reset every cycle), 0 / 2.76 / 6.89 bar(g) 5 pairs 75 measurements, limit per 02-Parameters §2.1
A6 9.1.4 Pressure Drop Pair, hard-stop, S→P and P→S 5 pairs 60 points + tare
A7 9.1.5 Seal Washout Pair 5 pairs 200 cycles in total

B. Thermal / Mechanical sequence

Step Test Mated (5 pairs) Unmated (5 plugs + 5 sockets)
B1 Helium leak test (optional) ✓ ✓
B2 9.2.1 Non-Op temp. cycling, hard-stop ✓ ✓
B3 Helium leak test (optional) ✓ ✓
B4 9.2.2 Op temp. cycling, nominal engagement ✓ ✓
B5 9.2.4 Hydrostatic test ✓ ✓
B6 9.2.3 Mechanical cycling, 5000 cycles with SA offset ✓ (pairs) –
B7 9.2.4 Hydrostatic test: unmated plug + socket and mated ✓ –

5. Sample needs (number of components)

Calculated with separate samples for each 9.1 test, since the specification allows parallel runs on different samples. Non-destructive tests (9.1.2–9.1.4) can reuse the same pairs if time allows. This reduces the need by up to 10 pairs per product, but should be documented in the report.

5.1 Per product

Test group UQD plug UQD socket UQDB plug UQDB socket
9.1.1 Burst – unmated 5 5 5 5
9.1.1 Burst – mated 5 5 – –
9.1.2 Fluid Loss 5 5 5 5
9.1.3 Force to Connect 5 5 5 5
9.1.4 Pressure Drop 5 5 5 5
9.1.5 Seal Washout 5 5 5 5
9.2 sequence – pairs 5 5 5 5
9.2 sequence – unmated 5 5 5 5
Total per size 40 40 35 35

5.2 Total (own verification)

Product Plug Socket Total
UQD02 40 40 80
UQD04 40 40 80
UQD06 40 40 80
UQD08 40 40 80
UQDB02 35 35 70
UQDB04 35 35 70
UQDB06 35 35 70
UQDB08 35 35 70
Total 300 300 600

Recommendation: order about 10 % spare per size for fixture run-in and retests.


6. Hybrid configuration (UQD plug + UQDB socket)

The specification mentions hybrid in 9.1.4 (hard-stop), 9.2.2 and 9.2.3 and in the mated lengths (Figure 4). If hybrid compatibility is marketed, add the following per size (02–08):

Test Samples
9.1.4 Pressure Drop (hard-stop) 5 pairs
9.2.2 Op temp. cycling → 9.2.4 5 pairs
9.2.3 Mechanical cycling (on-axis, compliance in the fixture) → 9.2.4 same 5 pairs

This gives 10 UQD plugs + 10 UQDB sockets per size. If 9.2.2 and 9.2.3 are run in series on the same pairs, 5 + 5 is enough.

Decision required: is hybrid to be included in the verification?


7. Cross-verification (§10)

Performed against at least 3 other UQD suppliers and in both directions: our plug against their socket, and their plug against our socket.

Test n per combination
9.1.2 Fluid Loss 3
9.1.3 Force to Connect 3
9.1.4 Pressure Drop 3
9.1.5 Seal Washout 3

Sample need per product and supplier (separate samples per test): 4 tests × 3 = 12 own plugs and 12 own sockets, plus the corresponding parts from the other supplier. Per product with 3 suppliers: 36 plugs + 36 sockets. That is 576 components in total for the 8 products, fewer if non-destructive tests share samples.

Reported with the Supplier Cross-Verification Report (§15.3.2). The list of suppliers with approved cross-verification is to be published.


8. Test log / run order (checklist per product)

Copy the block below per product and tick off.

Product: ______  Batch/date of manufacture (T0): ______

[ ] Pre-check (dimensions, visual, marking) – all samples
[ ] A1  9.1.1 Burst plug (5)
[ ] A2  9.1.1 Burst socket (5)
[ ] A3  9.1.1 Burst mated (5)            – UQD only
[ ] A4  9.1.2 Fluid Loss (5 pairs)
[ ] A5  9.1.3 Force to Connect 0 bar     (5 pairs × 5 rep.)
[ ] A5  9.1.3 Force to Connect 2.76 bar  (5 pairs × 5 rep.)
[ ] A5  9.1.3 Force to Connect 6.89 bar  (5 pairs × 5 rep.)
[ ] A6  9.1.4 Tare measurement
[ ] A6  9.1.4 Pressure Drop S→P (5 pairs × ≥6 flows)
[ ] A6  9.1.4 Pressure Drop P→S (5 pairs × ≥6 flows)
[ ] A7  9.1.5 Seal Washout P→S (5 pairs × 20)
[ ] A7  9.1.5 Seal Washout S→P (5 pairs × 20)
[ ] B1  Helium (optional)
[ ] B2  9.2.1 Non-Op temp. cycling (−40 °C 72 h / +70 °C 72 h)
[ ] B3  Helium (optional)
[ ] B4  9.2.2 Op temp. cycling (+5 °C 72 h / +65 °C 72 h)
[ ] B5  9.2.4 Hydrostatic test
[ ] B6  9.2.3 Mechanical cycling 5000 cycles
[ ] B7  9.2.4 Hydrostatic test
[ ] Supplier Verification Report completed

Time estimate for sequence B (per batch)

Step Minimum time
9.2.1 72 h + 72 h + ramps (~1 h) ≈ 6.2 days
9.2.2 72 h + 72 h + ramps ≈ 6.2 days
9.2.3 5000 cycles; at ~3 s/cycle ≈ 4–5 h per pair and fixture
9.2.4 (×2) ≥ 3 min + preparation

The climate chambers determine the lead time. Run several sizes at the same time in the same chamber cycle if the fixtures allow, since all sizes have the same temperature profile.


9. Open decisions before test start

  1. Proof pressure for 9.1.1 – value missing in the specification, which affects the max test pressure.
  2. Hybrid – should it be included (section 6)?
  3. Reuse of samples between non-destructive 9.1 tests – yes/no (affects section 5).
  4. Test medium for 9.1.5, 9.2.2–9.2.4: water or PG25.
  5. Population for 9.2 – one common population in series, or two separate (mated and unmated). The specification allows both; the plan above uses two.
  6. Cross-verification partners – which 3 suppliers?